Building a Retaining Wall
Building a Retaining Wall
Building a retaining wall involves much more than simply stacking blocks. Every successful project starts with careful planning, thoughtful design, and a solid foundation, long before construction begins. We begin by meeting with the client to discuss their vision, assess the property, and present a conceptual drawing that brings the proposed project to life. From there, we work with engineers to develop stamped engineered plans and secure the necessary city permits before any construction begins. Once everything is approved, it’s time to bring the vision to life! Follow along as we take you behind the scenes of a recent retaining wall project, sharing photos and insights from start to finish.

This picture simply shows the slope prior to work. Fence is there to contain pets; we removed their original fence.
Simple, basic layout. Rough grade of the proposed foundation.
2nd phase of layout. Foundation is 2 feet wide and will be compacted before additional work. Notice the white PVC pipe on the hill. As construction continues, pipes from the existing drainage system will be routed through the wall.
Compacted here, 2 feet wide and about 2 feet deep. Notice the temporary location of the PVC pipe, beyond the construction area.
1st course of the wall block with an exposed pipe protruding through at the bottom. Each protruding pipe is about 4 feet apart. The gravel behind the wall will extend up the entire height of the wall, allowing water to drain from the final height, down through the gravel and out the flow pipes. Basically, it’s an 8-foot-high French drain.
The same picture as before, shown from a different angle. The mesh materical is Geotex textile. A sheet of Geotex is inserted between every two layers of block. The Geotex extends back into the hill itself and is buried under the gravel, it becomes part of the hill. As we go up in height and add rock on top, the height of the fill helps support the wall.
Top view showing voids in the block filled with gravel.
Geotex is placed on top of the wall, glued in place every 2 feet.
Slightly higher perspective.
This is a different project showing the beginning of the French drain where water will ultimately flow through the drains of the earlier picture. The yellow spikes are inserted between each layer of blocks to add additional stability. Each block (over 700) gets 4 pins.
The French drain from the previous picture feeds into these outflows. Gravel extends from the bottom to the very top; consequently, water from downpours never collects. Rain water runs directly through the gravel and out the bottom.
Steps provide access to the area beyond the wall.
Almost ready for topsoil and sod.
Ready for irrigation, a new patio, a firepit, and sod.
We’ve created an extended backyard area where before there was unusable land.
The finished product.
What was once a steep, unusable slope has been transformed into a spacious, functional backyard with endless possibilities! From the carefully engineered foundation and reinforced retaining wall to the extensive drainage system working behind the scenes, every detail was designed for long-term stability and performance. The finished project not only gives the homeowners significantly more usable outdoor space but also creates the perfect setting for a new patio, firepit, and plenty of room to relax and entertain. It’s a great example of how thoughtful planning, proper engineering, and quality craftsmanship can turn a challenging landscape into a beautiful extension of your home. Have a similar challenge in your yard? Let Esposito’s help you make the most of your outdoor space!
Simple, basic layout. Rough grade of the proposed foundation.
2nd phase of layout. Foundation is 2 feet wide and will be compacted before additional work. Notice the white PVC pipe on the hill. As construction continues, pipes from the existing drainage system will be routed through the wall.
Compacted here, 2 feet wide and about 2 feet deep. Notice the temporary location of the PVC pipe, beyond the construction area.
1st course of the wall block with an exposed pipe protruding through at the bottom. Each protruding pipe is about 4 feet apart. The gravel behind the wall will extend up the entire height of the wall, allowing water to drain from the final height, down through the gravel and out the flow pipes. Basically, it’s an 8-foot-high French drain.
The same picture as before, shown from a different angle. The mesh materical is Geotex textile. A sheet of Geotex is inserted between every two layers of block. The Geotex extends back into the hill itself and is buried under the gravel, it becomes part of the hill. As we go up in height and add rock on top, the height of the fill helps support the wall.
Top view showing voids in the block filled with gravel.
Geotex is placed on top of the wall, glued in place every 2 feet.
Slightly higher perspective.
This is a different project showing the beginning of the French drain where water will ultimately flow through the drains of the earlier picture. The yellow spikes are inserted between each layer of blocks to add additional stability. Each block (over 700) gets 4 pins.
The French drain from the previous picture feeds into these outflows. Gravel extends from the bottom to the very top; consequently, water from downpours never collects. Rain water runs directly through the gravel and out the bottom.
Steps provide access to the area beyond the wall.
Almost ready for topsoil and sod.
Ready for irrigation, a new patio, a firepit, and sod.
We’ve created an extended backyard area where before there was unusable land.
The finished product.